Licensed and Insured Independent Pros
The rebuild contractor you reach through our line is an independent local outfit with its own license and insurance. Ask for the certificate of insurance at the first visit; a good contractor has it ready.
The water is gone and the fans have been picked up, but the kitchen still has a two-foot flood cut and no baseboards. Putting it back is restoration, and it is a different job from the cleanup.
Our referral line links Belmond homeowners with independent, licensed and insured contractors who handle the rebuild from drywall to paint. You get a written, line-itemed scope before anyone picks up a hammer.

Restoration is drywall, trim and flooring work done on a house that just got soaked. The contractors we refer around Belmond handle both the carpentry and the paperwork.
The rebuild contractor you reach through our line is an independent local outfit with its own license and insurance. Ask for the certificate of insurance at the first visit; a good contractor has it ready.
You get a written estimate itemized down to square feet of board, linear feet of base and shoe, and labor hours. Many write it in the line-item style adjusters already use, which cuts the back and forth on the claim.
Restoration is not usually a midnight job, yet a slow bid can hold up your entire claim. The dispatcher sets a real walkthrough window on the call with a contractor based close to Belmond.
The restoration side runs on texture sprayers, taping knives, miter saws and profile gauges, not fans. That kit, plus a steady hand, is what keeps a repaired wall from looking patched.
Each job follows the scope of loss: a written list of every material that came out during mitigation and has to go back in.

New drywall goes in above the flood cut, followed by tape, mud in three coats and a final sand. The hard part is texture: orange peel, knockdown and skip trowel all have to blend into the wall that stayed.
Wet MDF baseboard swells and never shrinks back, so it is replaced with a matching profile. Cabinet toe-kicks, and sometimes the sink base itself, get the same treatment after a kitchen leak.
LVP and laminate are usually replaced because water stays trapped under the locking joints. Solid hardwood that was dried quickly can often be refinished, while engineered flooring is far less forgiving.
The crew cuts a small chip from a dry wall and has the paint store scan it for a match. Repainting full walls to the corners avoids the shiny halo you get from spot painting.
Furniture, boxes and electronics can be photographed, inventoried, packed out and stored while the rebuild runs. The itemized list doubles as proof for the contents portion of the claim.
Before and after photos, the scope, the mitigation drying records and the final invoice go into one file. A complete file usually means fewer re-inspections and fewer arguments over supplements.
The first half of any water loss is mitigation: stop the source, pull the water, remove what will not dry and run dehumidifiers until the meter says done. Restoration is everything after that, and it is much closer to remodeling than to cleanup.
Take a dishwasher supply line that dripped under the cabinets for days before anyone noticed. The dry-out crew pulls the toe-kicks, drills or opens the cabinet bases and dries the subfloor. Restoration means sourcing a toe-kick that matches, swapping a swollen sink base and blending new flooring into the old at the doorway.
Or take an upstairs toilet overflow that came through the kitchen ceiling. After the wet ceiling drywall is cut out and the joists dry, someone still has to hang board overhead, match the texture and paint the full ceiling plane.
The crews that are great at fast tear-out are not always the ones you want doing finish work in your living room.
Plenty of companies only do the dry-out. Ask any contractor directly whether the rebuild is included, and make sure the answer is in the written scope.

The process has four steps, and the first is a short phone call.
Let the dispatcher know what came out during the dry-out and whether a claim is already open. We connect you with an independent rebuild contractor who works in Belmond and confirm a walkthrough time.
Your contractor checks every affected room with a meter first, because closing up a wet wall is the most expensive mistake in this trade.
The written quote lists each line: board by the square foot, base by the linear foot, flooring, paint and contents handling. Many contractors send it straight to your adjuster and write a supplement if hidden damage turns up.
When the last coat of paint is dry, you walk the house with the contractor and build a punch list. Nothing gets signed until the punch list is done, and any workmanship warranty should be on paper.

The dishwasher line had been leaking for who knows how long. The dry-out company left us with no toe-kicks and a sink base that looked like a sponge. The referral line put me in touch with a local contractor who matched the cabinet toe-kicks and talked to our adjuster so I was not stuck in the middle.
Upstairs toilet overflowed and a big chunk of the kitchen ceiling had to be cut out a week before the holidays. The contractor I was connected with hung new board, matched the knockdown and painted the whole ceiling. I honestly cannot find the patch.
I figured the hallway oak was headed for the dumpster. The contractor I reached through the referral service checked the boards, said they were solid oak and dry, and refinished them rather than replacing them. Honestly the floor looks better now than before the leak.
I own a duplex and the tenant was living out of two rooms while the rest sat gutted. The contractor gave me a line-item scope the insurance company accepted almost as written, and the paint matched on the first try.
One call connects you with an independent local contractor who handles the rebuild after water damage.
Mitigation is the emergency work that keeps damage from growing: water removal, tear-out, antimicrobial and drying. Restoration is the rebuild that follows: new drywall, matched texture, trim, flooring, cabinets and paint.
Insurance usually treats them as two parts of the same claim, often with two separate estimates.
That comes down to scope: one room of board and paint goes quickly, but a kitchen with cabinets and flooring takes much longer. The delays usually come from backordered materials and claim approvals rather than the actual work.
Ask your contractor for a written schedule with the order of trades.
In most cases yes. Insurers may suggest a preferred vendor, but the homeowner usually gets to choose who works on the house. Read your policy and confirm with your adjuster before signing anything.
A lot of the independent contractors we refer deal with adjusters every week and write estimates the way carriers like them.
Solid hardwood that was dried fast often can be. Light cupping may flatten as the moisture content returns to normal. A good contractor takes readings over a few days before deciding whether to sand and refinish.
Engineered flooring and boards that crowned, split or buckled usually need replacing.
They should, if the contractor matches the texture on a test piece and repaints full walls instead of spot painting. Paint is matched from a chip of the existing wall, not from a guess at the color name.
Ask to see the texture sample before it goes on the wall, and walk the room in daylight before sign-off.
The contractors we refer live and work in the area, so they know the local housing stock and the local permit office.
Older houses close to downtown Belmond often have plaster and real wood trim, which take more work to match. Newer subdivisions mean builder-grade drywall, MDF base and LVP that are easier to source but quick to swell.

Tell us what came out and we will connect you with a local contractor.
Call +1-877-637-9008